
|
| Cutting through the cement to reach the ground |

|
| One hole completed |

|
| Getting things ready to fuse |

|
| Running pipe into the building to fuse the header |

|
| Some more backfill |
 |
 |
Geo Loop Tec & Air Tec's Geothermal
System

|
| Getting the drill rig set up |

|
| Our exposed field |

|
| Getting organized to run the pipe to the building |

|
| Got to have the buried water line tape in place |

|
| Almost complete |
 |
 |

|
| Getting the pipe into the hole |

|
| Close up of the holes |

|
| Hooking things up to the building |

|
| Backfilling the field |

|
| Everything is complete |
 |