
|
| Pressure testing the slinkies |

|
| The pipe has been installed and is being fused at the header pit |

|
| The header pit with lines running to the structure |

|
| The manifold is almost complete |
 |
 |

|
| Excavating the trench with benches |

|
| In the header pit ready for fusing |

|
| Supply and return lines running from the header to the structure |

|
| The manifold is completely installed and the system is ready for purging |
 |
 |

|
| The trench is complete and ready for the slinky to be installed |

|
| Fusing the supply and return lines to the header |

|
| The manifold is ready for installation |
 |